AIM Rope Access carried out high‑level decoration removal inside the main swimming pool complex at Craig Tara Holiday Park. Several large decorative features had begun to show signs of corrosion, requiring safe removal from directly above the pool area.

Working at height within a busy leisure facility, our technicians used rope access to reach the suspended decorations and lower them to ground level without disrupting pool operations. The work demanded precise rigging, controlled lifting and careful coordination with the site team to maintain safety for staff and guests.

The project was completed efficiently during out‑of‑hours shifts, allowing the client to continue normal operations without any disruption.